Typical installation includes transporting the shelter and our equipment to your location and marking the area as needed, digging the hole, setting the unit in, leveling, installing the turbine vent, and backfilling the hole. They will leave the leftover dirt close by as it will be needed for you to fill in as it settles.
It does not cover hitting a large amount of rock that our regular machine can not get through without excess time involved. It does not cover hauling off excess dirt; usually, that is $500 extra. It does not cover any extra trips back unless there is a problem during installation. All installers are bonded and insured.
Note: We can install in Arkansas and just across the state line only. Sorry!
For printable quotes to provide to your bank, please scroll further down.
Please wait a moment after hitting submit
LS -Long rear shelf
CS - Corner shelf
HH - Hooks and Hinges for bunks
Flush - Flush mount frame for in slab
12ga - HD 12 ga. door (14 ga std)
Jack - Emergency jack option
EH - Extra handrail
EC - Extra electric coupler (one std)
ET - Extra turbine vent
ES - Extra staircase